Pictures taken July 23, 1999
This is the North entrance which faces the playground.
The atrium area is being prepared to receive a terrazzo floor
One of the temporary classrooms is gone.
This is the South entrance facing the MS/HS parking lot.
This area is being prepared for the terrazzo flooring.
The lunchroom/multipurpose room now has a roof.
This photo looks into the kitchen from the lunchroom
This is where students will pick up their lunch trays.
Two weeks ago this wall was one block high.