Page 15

Pictures taken August 3, 1999

This dark photo shows a worker on stilts pulling wiring for the tv/vcr in each classroom.

Light fixtures are stored in the 5th and 6th area.

Finally, there are signs of interior walls in the 5th and 6th wing.

This must be a roof vent.

the following photos were taken August 10

The terrazzo floors are being extended to the 5th and 6th wing.



Since school starts in 2 weeks, there is lots of activity.
There are clouds of dust everywhere as the school is getting cleaned.
Concrete is being poured, wallpaper is being hung, the wiring crew is working,
and cabinets are being installed.


Three of the temporary units are gone; two of them to Adel.

The remaining temporary building is being readied to be moved out.