Photos taken September 10, 1999

The desk/counter area is being assembled in the office area.

Adjacent to the office is the new nurse's station.
There are two beds; separating curtains are yet to be installed.

Cabinet units are stored in one of the old classrooms.
This is off-limits to students until remodeling is complete.

The sidewalk for the south facing door between the lunch room
and 5th & 6th wing is about to be poured.

Now all the 5th and 6th classrooms can be seen because
both sides now have the interior walls roughed out.

The addition to the high school gym is now making progress.
The roof is now in place.

The following photos taken September 16, 1999

The parking lot on the south side of the
5th and 6th grade wing is ready to pour.

The custodial staff is still hauling away empty boxes.